BIM_Port
Semester: 2018W
Building Type: Research Facility
BGF: 36.000 m2
Innovative F&E-Centre
In the Neuss harbor, the planning of an innovative research and development center for the automotive industry is planned. On the 17,500 m² planning area, a center for product development, prototype construction, and component testing will be established. The building concept follows a modular construction principle and is characterized by its flexible usage possibilities.
Students:
Andrea Filkova, Clemens Horvath, Guido Bauer, Dominik Breitfuß, Georg Hofbauer, Florian Dirnberger, Maksim Latynin, Illia Mitalov, Artem Igumnov, Sara Treccarichi Scavuzzo, Ekaterina Ermishkina, Bogna Haponiuk, Merima Sabic, Povilas Valiulis, Anja Reiter, Nora Pfliegler, Maximilian Knoll, Manuela Hofer, Rukiye Vezi, Mark Aurel Evangelista, Fabian Pitscheider, Stephan Loncsek, Alexandra Kotecki
To the VDI-Competition, opens an external URL in a new window
- 1. Prize - „RHYTHM“ - Mark Aurel Evangelista, Alexandra Kotecki, Stephan Loncsek, Fabian Pitscheider
